Modernization of fan cooler cells launched in Generation Plant Kraków

The project involves modernization of countercurrent fan cooler of 11,4 x 11,4 x 13m and nominal hydraulic load of 1500 m3/h. The existing reinforced concrete structure is characterized by a considerable loss of the reinforcement covering and its visible corrosion, cracks and scratches on concrete structures. Existing internal equipment and drive systems are not fit for further operation and were shut down. Equipment of fan coolers planned for modernization  was partly dismantled due to its technical condition and safety reasons. 

The scope of the modernization includes repair and modernization of existing concrete structure of fan coolers, repair of the façade and slab roof of the cooler. Modernization project assumes replacement of entire technical equipment including installation of new sling load eliminators, wooden water distribution systems, polypropylene sprinklers, distribution troughs and pipelines supplying water, including necessary fittings.

To improve the operation of the cooling system, there are plans to replace all auxiliary equipment such as the cooling water evacuation system, modernize switching stations, power supply and control installations.

Modernized cooler will be equipped with motors without a mechanical gear, controlled by an inverter with an automatic regulation of cooled water temperature which will make it possible to efficiently control thermal power of the cooler and at the same time optimize consumption of electric energy required to force air draught inside the cooler. 

The project is planned to be completed in Q2 2018.

As part of our site, we use cookies to provide you with the highest level of service, including in a manner tailored to individual needs. Using the site without changing the settings for cookies means that they will be placed on your device. You can change your cookie settings at any time. Find out more about our privacy policy.